Cut 8 · 8 Nov 2026 · 38 min 10 s
The cut log: one documentary, cut by cut
I’m cutting a short documentary about a family of potters in a valley village. Every cut is listed here, newest first, with what changed and how long the film is now.
212 Added3 Changed1 Fixed2 Dropped
Get the cut log every Sunday
One letter a week: the new cut, what went and how long the film runs now.
Cut 9 is next
What I’m working on this week, and how far I’ve got.
- Music spottedSpot the musicWhere the guitar comes in, and where it stops.
- 2 of 4 scenesTrim the last interviewsTwo of the four still run longer than the story needs.
- Two versions cutThe endingWhether the last shot is the last firing or the empty yard.
The List, edition by edition
Cut 8Fine cut8 Nov 2026
- AddedOpening on the valleyA minute of valley light with no voices: only wind and a wheel turning, far off.+1 min
- AddedFinal titlesTwo names on screen at the end: the old potter’s and his daughter’s.+20 s
- ChangedPotter interviewTrimmed from eight minutes to five, keeping his pauses.−2 min
- ChangedMarket at dawnMoved to the very end, after the last firing.Scene 19
- ChangedWheel under the interviewsRaised a little under the last two so the workshop stays in the room.Sound
3 more
- FixedSubtitle timingSeven lines were half a second late.Scenes 4 to 11
- DroppedThe tortilla stallFifty seconds I liked, and the film did not need.−50 s
- DroppedSecond shot of the courtyardThe first one tells the story.−10 s
Cut 7Rough cut 61 Nov 2026
- DroppedThe market sceneMy favourite scene goes: it repeats what he already says.−2 min
- AddedHand-lettered signA chalk price board at the stall, five seconds.+20 s
- ChangedKiln sceneOpened out with a second, wider shot of the yard.+30 s
- ChangedMusicThe temp guitar is out of the middle; it was doing the interviews’ work.Scenes 9 to 14
- FixedPotter’s nameIt was spelled two ways in the lower thirds.Scene 6
Cut 6Rough cut 525 Oct 2026
- DroppedThe weather reportA radio forecast the sky already tells us.−2 min
- ChangedWalk to the kilnTwo shots of him carrying the clay become one.−1 min 30 s
- AddedWheel bridgeThe sound of the wheel now links the three middle scenes.+30 s
- ChangedMiddle sectionRe-ordered so the wheel comes before each interview.Scenes 10 to 16
- FixedClipped wordA word was cut off at a join in the third interview.Scene 12
Cut 5Rough cut 418 Oct 2026
- DroppedRetired schoolteacherFive minutes of an interview I had to stop using; one line stays.−5 min
- AddedVoice-over lineFour sentences of narration to carry the story across the gap.+30 s
- ChangedOrder of the middleTwo scenes swapped so the story runs in the right season.+30 s
- ChangedGaps between scenesA beat of quiet added where the film moves to a new day.Scenes 8 to 20
- FixedWrong clipA shot of the wrong wheel is replaced.Scene 17
Cut 4Rough cut 311 Oct 2026
- DroppedFirst firingThe first firing was too much like the second.−3 min
- ChangedHands on the clayHeld for eight seconds in silence, with nothing said over it.−1 min 30 s
- ChangedOpeningCut by half a minute so the first voice comes sooner.−30 s
- AddedRooster bedA quiet bed of roosters and dogs under the first fifteen minutes.Sound
- FixedAudio popA pop at a join in the cousin’s phone call.Scene 22
Cut 3Rough cut 24 Oct 2026
- ChangedFirst morningMoved from the middle to the start of the film.Scene 2
- DroppedDigging the clayThree scenes of digging and sieving clay, kept as one shot.−5 min
- DroppedCousin’s phone callThe call is shortened to the one sentence that matters.−2 min
- FixedInterview levelsTwo interviews were five decibels louder than the rest.Scenes 8 and 15
Cut 2Rough cut 127 Sep 2026
- DroppedThree scenes fell outThe first scenes to go were ones that never mattered.−8 min
- ChangedOrder of the daysThe film now follows one week, not three.−4 min
- FixedFrame rateOne clip was 25 frames, the rest 24.Scene 26
Cut 1Assembly20 Sep 2026
- AddedEverything I shotEvery usable scene, in shooting order, as one long timeline.Start: 1 h 12 min
- AddedThe potter’s storyA first pass at the one thread that runs through the film.Scenes 1 to 44
Latest letters
The cut log, week by week, and a few notes on how I work.

Cut 8: the fine cut, and what is left of market day
The film is down to 21 scenes and thirty-eight minutes. Here is what I added, what moved and what finally went.

Cut 7: losing the market scene
The scene I loved most is out. Why I cut it, and how I knew.

Cut 6: the potter’s wheel carries the middle
One sound that ties three scenes together, and how far away I put it.

Cut 5: an interview I had to stop using
Seven minutes with a retired schoolteacher, and the one line I kept.

Cut 4: the kiln door, and how long to hold a pair of hands
Eight seconds of hands on the clay did more than two minutes of talk.
Downloads and merch
Shop
Downloads arrive by email. Merch is printed to order and shipped by Printful.
- 212 sounds · WAV · 3.1 GB$29
Documentary Sound Pack
Two hundred field recordings of potter’s wheels, kilns, markets and valley weather, all recorded at 48 kHz.
- 32 files · WAV · 640 MB$12
Room Tone Pack
Thirty-two minutes of room tone from workshops, courtyards and kitchens, to fill every gap in an interview.
- Project template · 14 bins · 3 sequences$18
Assembly Edit Template
A project with the bins, sequences and markers I start every documentary with.
- PDF · 12 pages$8
Interview Transcript Sheets
Printable sheets for logging an interview by time, with room for the best line, its place and a translation.

About
About me
I’m Mireya. I live in Oaxaca, and I film and edit short documentaries about the people who make things here: potters, weavers, bakers and carvers. Most of what I do is sit in a dark room and take out the shot I like best.
My letter is free. It is a diary of the one film I’m cutting now, a cut at a time. I sell the sound packs, templates and printables I use in the edit room, and I update them when the film shows me something missing.